{"id":388,"date":"2012-06-01T07:17:25","date_gmt":"2012-05-31T19:17:25","guid":{"rendered":"https:\/\/bamba.org.nz\/?p=388"},"modified":"2012-12-02T12:52:50","modified_gmt":"2012-12-02T00:52:50","slug":"trail-updates-danzig-logging-the-bull-run","status":"publish","type":"post","link":"https:\/\/bamba.org.nz\/?p=388","title":{"rendered":"Trail updates: Danzig logging \/ The Bull Run."},"content":{"rendered":"<p><strong><em>Logging<\/em>:<\/strong><\/p>\n<p>Wayne Boness\u00c2\u00a0(Principal Ranger) has spoken to BAMBA \u00c2\u00a0in length about the new time frames for the logging of Danzig. There had been further delays with the consent process at the last-minute and also the Logging contractors had been delayed else-where due to the weather!\u00c2\u00a0<strong> A lower Skid site and also Culvert will be put in place in July. It\u00e2\u20ac\u2122s hoped this will only affect the lower Danzig area for\u00c2\u00a03 or\u00c2\u00a05 days depending on the weather?\u00c2\u00a0 \u00c2\u00a0The rest of the logging will not take place till around October or November or even possible in the new year of 2013!.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><em><strong>The Bull Run<\/strong><\/em>:<\/p>\n<p>Wayne discussed in great detail the issue with the DOC covenant. He has finally managed to talk to the correct \/ higher up staff member but due to changes happening within DOC this has taken a few weeks. In short DOC should be up to inspect the area in question before the end of June \/ early july\u00c2\u00a0to advise. Wayne stated however that DOC was very open and what had been done so far should hopefully not be of too much concern for all parties!<\/p>\n<p>&nbsp;<\/p>\n<p><strong>In short<\/strong> &#8211; Danzig forest trails are still there and\u00c2\u00a0still able to be used right up till around October, November of this year!\u00c2\u00a0\u00c2\u00a0 The Bull Run is not far from completion and just really awaits the hopeful\u00c2\u00a0thumbs up so it can be\u00c2\u00a0open to you all!<\/p>\n<p>Happy Trails.<br \/>\nPaul.<\/p>\n<p>Secretary.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Logging: Wayne Boness\u00c2\u00a0(Principal Ranger) has spoken to BAMBA \u00c2\u00a0in length about the new time frames for the logging of Danzig. There had been further delays with the consent process at<a href=\"https:\/\/bamba.org.nz\/?p=388\" class=\"more-link\">Read More <span class=\"screen-reader-text\">Trail updates: Danzig logging \/ The Bull Run.<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-388","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/bamba.org.nz\/index.php?rest_route=\/wp\/v2\/posts\/388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bamba.org.nz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bamba.org.nz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bamba.org.nz\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/bamba.org.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=388"}],"version-history":[{"count":0,"href":"https:\/\/bamba.org.nz\/index.php?rest_route=\/wp\/v2\/posts\/388\/revisions"}],"wp:attachment":[{"href":"https:\/\/bamba.org.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bamba.org.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=388"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bamba.org.nz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}